Temporary Works – Case Study Review & Q &A

Case study driven overview of the interesting or challenging temporary works and demolition projects Andun have been involved in during 2021

Case Studies

  • Bridge Demolition – Heartlands HS2 (5:47)
  • Listed Arch Bridge Repair – Misterton Bridge (25:49)
  • Blow Down Demolition – Eggborough Power Station (19:34)
  • Pull Down & Blow Down – Scunthorpe Steelworks (13:13)
  • Basement Propping – Edinburgh (00:00)