Andun Engineering Consultants (Andun) provide specialist lifting equipment design for temporary works and demolition projects across the UK.
Andun delivers effective design solutions for projects where access, load or work sequencing challenges require a bespoke design solution.
- Lift beam design
- Tower crane base design
- Crane design
Our specialist knowledge and ability to define innovative solutions to complex problems means that we can provide a full solution from the initial design stage through to project completion.
Where appropriate we utilise the latest 3D modeling and FEA techniques to design, analyse and demonstrate our design solutions.
Recent Case Studies

Bridge Demolition Engineering - Heartlands Parkway
Demolition of a 100-metre three-span road bridge over an active railway. The bridge was demolished over four weeks to make way for the northern section of HS2’s phase one route between London and the West Midlands.

Bridge Demolition Engineering - SAS13 Viaduct
Overview of the bridge demolition engineering for the removal of a 125m viaduct across the Stetchford to Aston (SAS) rail line.

Eggborough Power Station Cooling Tower - Blowdown
Blowdown demolition of eight cooling towers at a decommissioned coal fired station in North Yorkshire. These works were part of the overall demolition of Eggborough Power Station which was decommissioned in 2018.

Lifting Design & Sequencing - Spooner Row
Demolition engineering and lifting design for the removal of a timber signal box at Spooner Row in Norfolk.