Typically each webinar features a review of the key concepts related to the topic, any relevant references and standards, and illustrative case studies to highlight key elements or common engineering challenges.
These are presented by members of the Andun team, as well as a range of guest speakers willing to share their expertise and experience.
Whilst each session is recorded and shared via email, YouTube and on this page of our website, this only covers the pre-prepared presentations and case studies. At the end of each session there is a Q & A session that is not recorded and is only available to those watching live.
TEMPORARY WORKS WEBINAR HISTORY
THE SERIES OF TEMPORARY WORKS WEBINARS ARE A CORE PART OF OUR COMMITMENT TO BUILDING INDUSTRY KNOWLEDGE AROUND THE IMPORTANCE OF TEMPORARY WORKS AND DEMOLITION ENGINEERING FOR CONSTRUCTION PROJECTS.
Since the first webinar, which was held in April 2020 as a way of reaching engineers during the pandemic,
we have now held
50 +
sessions
and had
15,000 +
event sign ups from various different areas of the construction industry.
These sessions now form a library of recordings available to watch for free on demand.
WEBINAR LIBRARY
Temporary Works Design Check Categories
This CPD webinar recording covers the engineering considerations for checking temporary works in construction. Speakers: Joshua Martin and James Dunlop It explains the different categories of checks (Cat 0 to Cat 3) as defined by BS5975, and the role of the Temporary Works Coordinator in ensuring compliance and safety. The...
Temporary Works For Demolition 2024
An in-depth review of demolition processes within the context of temporary works. Introducing the concept of demolition and its critical role in construction projects. Although demolition is often perceived merely the destruction of structures, it involves meticulous planning, design, and execution to ensure safety and efficiency. Angus Holdsworth, Managing Director...
Basement Temporary Works - June 2024
Overview of the essential aspects of Basement Temporary Works engineering. This CPD webinar recording examines the types of temporary works required for basement schemes and the engineering factors that need to be considered and mitigated. Elements of Basement Temporary Works Discussed Varied and High-Risk Construction: The process is dependent on...
Bridge Demolition Engineering Practices and Case Studies
CPD webinar overview of bridge demolition practices covering various aspects of the demolition process with real-world case studies. Webinar Overview Types of Bridges and Demolition Constraints An exploration of different bridge structures and the materials used, such as concrete, steel, and masonry, and how these impact demolition strategies. Understanding the...
Propping and Needling - Design Considerations & Case Studies
April’s temporary works webinar focused on the design considerations of propping and needling in cut-and-carve demolition projects. Presenters: Joshua Martin and Richard Boyle This session, aimed at construction professionals, structural engineers, and project managers, highlighted the best practices and technical insights for handling load-bearing walls during renovations and demolitions. Key...
LPS Structure Demolition Engineering [Video]
This webinar focused on the demolition engineering of Large Panel System (LPS) structures, specifically addressing demolition practices, risks, and mitigation strategies. Webinar Overview: Here is a brief review of the topics discussed In-Depth Analysis of LPS Structures: Understand the construction, risks, and historical context of Large Panel System buildings, emphasising...
Temporary Works For Construction Industry - March 2024
This webinar explores the vital role of temporary works for construction professionals and the complexities of temporary works in construction and demolition projects. Offering expert insights and case studies on innovative solutions and safety considerations essential to engineering practices. The webinar meticulously unpacks their pivotal role and historical evolution within...
Chocking Frames, Tower Cranes & Grillages - Leadenhall One Case Study
Webinar Overview Review of the engineering to design of the chocking frames and tower crane grillages for the construction of a 35-storey structure adjacent to Leadenhall Market. Project Scope and Objectives Project Constraints and Challenges Design and Planning Key Takeaways Link to additional resources Temporary works forum www.twforum.org.uk BS 5975:2019...
Temporary Works & Demolition Case Studies
Explore a variety of temporary works and demolition engineering case studies from our recent projects. Gain insights into design challenges encountered and temporary works design and demolition techniques employed across various projects. This webinar provides an overview of 15 key engineering projects undertaken in 2023. This included the following engineering...