Delivering specialist temporary works design and checking services for the construction industry.
Andun support tier 1 and 2 contractors throughout the project lifecycle to proactively deliver effective temporary works solutions to complex engineering problems.
We have extensive experience on large infrastructure and redevelopment projects across the UK.
Including work on a wide range of smaller, bespoke, challenging or emergency temporary works design projects, which utilise the extensive knowledge and experience of our team of engineers.
Recent Case Studies
Bridge Replacement - Mytholmroyd
Replacement of a two-span footbridge over the River Calder in Yorkshire with significant constraints during the demolition and replacement installation phase.
Tower Crane Grillage Design - One Leadenhall
The Bristol Beacon project was a large-scale refurbishment initiative that was completed over a five-year period and involving extensive temporary works design and demolition engineering.
Extensive Temporary Works & Demolition Engineering - Bristol Beacon
The Bristol Beacon project was a large-scale refurbishment initiative that was completed over a five-year period and involving extensive temporary works design and demolition engineering.
Internal Climbing Tower Cranes & Chocking Frames - One Leadenhall
Design and sequencing of two internal climbing tower cranes, including chocking frames and associated temporary works used in the construction of One Leadenhall a 35-storey structure adjacent to Leadenhall Market in Central London.