Delivering specialist temporary works design and checking services for the construction industry.
Andun support tier 1 and 2 contractors throughout the project lifecycle to proactively deliver effective temporary works solutions to complex engineering problems.
We have extensive experience on large infrastructure and redevelopment projects across the UK.
Including work on a wide range of smaller, bespoke, challenging or emergency temporary works design projects, which utilise the extensive knowledge and experience of our team of engineers.
Recent Case Studies

Eggborough Power Station Cooling Tower - Blowdown
Blowdown demolition of eight cooling towers at a decommissioned coal fired station in North Yorkshire. These works were part of the overall demolition of Eggborough Power Station which was decommissioned in 2018.

Lifting Design & Sequencing - Spooner Row
Demolition engineering and lifting design for the removal of a timber signal box at Spooner Row in Norfolk.

Scunthorpe Steelworks - Push Down/Blow Down Demolition
Demolition engineering and methodology for the removal of two chimneys at Scunthorpe Steelworks.

White Hart Lane Phase 1
Andun worked with the demolition contractor DSM to provide demolition sequencing and temporary works designs on the White Hart Lane redevelopment during both phases of the demolition.