Delivering specialist temporary works design and checking services for the construction industry.
Andun support tier 1 and 2 contractors throughout the project lifecycle to proactively deliver effective temporary works solutions to complex engineering problems.
We have extensive experience on large infrastructure and redevelopment projects across the UK.
Including work on a wide range of smaller, bespoke, challenging or emergency temporary works design projects, which utilise the extensive knowledge and experience of our team of engineers.
Recent Case Studies

Prestressed and Post-Tensioned Flyover Demolition - Regent Street
Demolition engineering case for removal of a flyover at Regent Street in central Leeds with prestressed and post-tensioned structural elements

Top Down Demolition Of LPS Structure - Goscote House
Top down demolition of a 23 storey high rise Large Panel System (LPS) structure in Leicester City Centre.

OPC Retaining Wall Foundation - Barking Riverside
OPC retaining wall foundation case study for a project on challenging ground, to support a brownfield housing development in London.

Crane Dismantling - Greenock Docks
Demolition engineering for the sequential dismantling of a large container crane adjacent to a live port terminal at Greenock Port.