Delivering specialist temporary works design and checking services for the construction industry.
Andun support tier 1 and 2 contractors throughout the project lifecycle to proactively deliver effective temporary works solutions to complex engineering problems.
We have extensive experience on large infrastructure and redevelopment projects across the UK.
Including work on a wide range of smaller, bespoke, challenging or emergency temporary works design projects, which utilise the extensive knowledge and experience of our team of engineers.
Recent Case Studies
![](https://www.andun.co.uk/wp-content/uploads/2024/06/Walters.png)
Demolition Engineering - Pontypridd Retail Complex
Demolition engineering to demolish a large waterfront retail structure located on a live high street with significant space and access constraints.
![](https://www.andun.co.uk/wp-content/uploads/2024/05/Cat-3-Check-e1717164331147.png)
Cat 3 Check - Thames Tideway Sewer Slab Lifting Arrangement
Delivery of a Cat 3 check to verify the design of the gantry frame, lifting lugs, lifting arrangement and stability to facilitate lifting the 1100 Tonne Thames Tideway sewer cover slab into position.
![](https://www.andun.co.uk/wp-content/uploads/2024/05/Facade-stockport-wheelhous.png)
Facade Retention - The Wheelhouse Stockport
Demolition sequencing and facade retention design to enable the restoration of a historic grade II listed riverside wheelhouse in Stockport, with significant access and sequencing constraints.
![](https://www.andun.co.uk/wp-content/uploads/2024/04/Cockrow-Bridge-Demolition.jpg)
Post-Tensioned Bridge Demolition - A3 Cockrow
Demolition of a lightweight post-tensioned bridge over the A3 as part of a broader scheme of infrastructure improvements.