A review of four complex demolition case studies where Andun Engineering Consultants have provided temporary works design and demolition engineering support.
Keynsham – Pull Downs
Gladstone Docks – Industrial Demolition
Premier House – Basement Demolition
Centrepoint – Cut & Carve Demolition
Webinar Overview
Panelists: Joshua Martin (Andun Engineering Consultants), David Stevens (Andun Engineering Consultants) & Richard Boyle (Andun Engineering Consultants)
Date: 19th August 2022
Duration: 40:27
Content Outline
Demolition Overview (00:16)
Keynsham – Pull Downs – (05:26)
Gladstone Docks – Industrial Demoltion (13:15)
Premier House – Basement Demolition (20:13)
Centre Point – Cut & Carve Demolition (29:05)