Temporary Works Design

Delivering specialist temporary works design and checking services for the construction industry.

Andun support tier 1 and 2 contractors throughout the project lifecycle to proactively deliver effective temporary works solutions to complex engineering problems.

We have extensive experience on large infrastructure and redevelopment projects across the UK.

Including work on a wide range of smaller, bespoke, challenging or emergency temporary works design projects, which utilise the extensive knowledge and experience of our team of engineers.

TEMPORARY WORKS DESIGN SERVICES

Andun can provide design services for a wide range temporary works including;

  • Façade Retention
  • Lift Beam Design
  • Basement Propping
  • Tower Crane Base Design
  • Piling Platforms
  • Crane Platforms
  • Excavation Support
  • Specialist Lifting Equipment

DESIGN APPROACH

Contractors work with us because of our practical and cost-effective approach to temporary works

Designs are implemented in line with in-house temporary works management procedures (based on BS5975) that are designed to ensure that the design is delivered safely in practice.

TENDER SUPPORT

The earlier that temporary works are considered within the framework of a project the more scope there is to mitigate time and cost implications with effective design and sequencing.

Andun are able to provide support at the tender stage all the way through to project completion.

3D MODELLING AND BIM

Andun utilise 3D modelling and drawings to illustrate the efficacy of designs.

Where appropriate, we have in-house 3D printing capabilities to provide physical models of proposed temporary works design solutions.

This ensures efficient sequencing and provides proof of concept to stakeholders around the impact of works on structural integrity, as well as the effectiveness and efficiency of the temporary works during the project.

Temporary works can be included in the BIM model to allow for clash detection between the temporary works and proposed permanent works. Early clash detection can save significant time and costs on a project.

The 3D model can also be used to check for clashes with proposed plant, i.e. piling rigs.