Andun Engineering Consultants (Andun) provide specialist lifting equipment design for temporary works and demolition projects across the UK.
Andun delivers effective design solutions for projects where access, load or work sequencing challenges require a bespoke design solution.
- Lift beam design
- Tower crane base design
- Crane design
Our specialist knowledge and ability to define innovative solutions to complex problems means that we can provide a full solution from the initial design stage through to project completion.
Where appropriate we utilise the latest 3D modeling and FEA techniques to design, analyse and demonstrate our design solutions.
Recent Case Studies
Post-Tensioned Bridge Demolition - A3 Cockrow
Demolition of a lightweight post-tensioned bridge over the A3 as part of a broader scheme of infrastructure improvements.
Footbridge Demolition - A3 Old Wisley Lane Bridge
Demolition of a footbridge over the A3, which was constrained by environmental concerns, the proximity of the replacement bridge and service protection requirements.
Bridge Demolition - M25 Clearmount
The demolition of a steel and concrete bridge over the M25 with significant time and stakeholder pressure due to the first full weekend closure of one of the busiest parts of the UK road network to facilitate the work.
Bridge Replacement - Mytholmroyd
Replacement of a two-span footbridge over the River Calder in Yorkshire with significant constraints during the demolition and replacement installation phase.