Andun provide temporary works design and demolition engineering support for rail projects across the UK.
Our team can adapt our solutions to meet the unique design challenges that engineering within the rail environment can create.
With extensive experience working within the rail environment, we work within the network rail procedures framework.
Over the years we have built an extensive range of case studies from a range of rail infrastructure projects
- HS2
- Crossrail
- Birmingham New Street Station
- Reading Station
- Loughor Viaduct
Our specialist knowledge and ability to define innovative solutions to complex problems means that we can support the progress of the job with the from tender stage through to the award and completion of the works.
Recent Case Studies
Facade Retention - The Wheelhouse Stockport
Demolition sequencing and facade retention design to enable the restoration of a historic grade II listed riverside wheelhouse in Stockport, with significant access and sequencing constraints.
Post-Tensioned Bridge Demolition - A3 Cockrow
Demolition of a lightweight post-tensioned bridge over the A3 as part of a broader scheme of infrastructure improvements.
Footbridge Demolition - A3 Old Wisley Lane Bridge
Demolition of a footbridge over the A3, which was constrained by environmental concerns, the proximity of the replacement bridge and service protection requirements.
Bridge Demolition - M25 Clearmount
The demolition of a steel and concrete bridge over the M25 with significant time and stakeholder pressure due to the first full weekend closure of one of the busiest parts of the UK road network to facilitate the work.